LOS PENASQUITOS BRIDGE REPLACEMENTS. The work consists in general of performing in-line single-track bridge replacements for the bridges at MP 246.1, MP 246.9, MP 247.1, and MP 247.7 on a portion of the LOSSAN commuter rail corridor in the City of San Diego. Proposed work includes track construction; construction of four new single-track bridges and demolition and removal of the existing bridges; scour protection installation; coordination of existing utilities and railroad signaling temporary relocation; construction of drainage structures; site work and track bed preparation (including fencing, signage installation, site clearing, planting, site restoration, and ballast); in addition to procuring all materials and performing all other work necessary to complete the work in accordance with the Contract Plans and Special Provisions. The Engineer’s Estimate is $15,920,537. The Prime contractor must perform with their own organization at least 35 percent of the work. The Prime must have a valid A license. The project is funded in whole or in part with Federal Transit Administration (FTA) funding. The UDBE goal for this project is 6.42 percent. Bids due 08/05
For details to this bid and hundreds more nationwide go to, http://www.envirobidnet.com – Take a free 30 Day Trial (no cc required)
Most Users Ever Online: 429
Currently Online:
46 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950