San Carlos: 1232 Cherry Street Building Demolition Project. The scope of work generally includes, but not limited to, mobilization, traffic control, water pollution prevention control, dust prevention and control, site cleanup, hazardous material abatement, temporary fencing, building demolition, trenching, disconnection and/or abandonment of existing utilities, protection of existing buildings and structures, disposal, grading, concrete removal and improvements, roadway resurfacing, installation of bollards and site restoration. The Engineer’s Estimate is between $200,000 and $250,000
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
70 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19932
Posts: 28166
Administrators: JOHN: 7602, John: 6930