San Bruno: Prequalification - The scope of work includes, but not limited to: demolition of the existing two-storyrecreation center that includes: a gymnasium, office space, and multiple classrooms, akitchen and an adjacent pool. The construction of the new two story recreation buildingincludes an indoor pool equipped with showers, restrooms and lockers, a communityroom, and regulation basketball court with two side courts, with an indoor above courtwalking track, a full and functioning fitness room, catering kitchen, and several classroomspaces, and a bid alternate for a seasonal exterior pool, adjacent surface parking,realignment of City Park Way and an adjacent channelized creek, as well as associatedsitework including grading, installation of sewer and water infrastructure improvements,pedestrian and vehicular hardscape, softscape and trash/generator enclosure structure.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
66 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950