SUMP 119 OUTFALL DEMOLITION PROJECT. The work to be performed under this Contract includes the furnishing of all labor, materials, tools and equipment for the removal of six (6) abandoned bents, piles, and two groups of dolphin piers from the Sacramento River. Bents number one and two consist of two wooden piles and a concrete block, bents three through six consist of three wooden piles and a concrete block, and the dolphin piers consist of five piles and a wooden spacer Bids due 05/02
Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
65 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950