Metrolink Parking Lot Expansion Project. The Work generally consists of hazardous material remediation and demolition of an existing vacant industrial warehouse building (including foundation) located at 265 S. Willow Ave.; utility relocation and coordination; construction of asphalt concrete pavement, Portland cement concrete sidewalk, access ramps, curb and gutter and driveways; construction of underground storm drainage improvements; construction of slurry seal; installation of underground electrical and parking lot lighting system; construction of irrigation system and landscaping improvements; traffic striping and signage improvements; and all appurtenant work. Bids due 03/26
Details to this bid & hundreds more nationwide at,. http://www.envirobidnet.com Free 30 Day Trial – 15% discount for DF members if you subscribe (use code D0246 when taking a trial to qualify)
Most Users Ever Online: 429
Currently Online:
71 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950