Port of Oakland: HOWARD TERMINAL WHARF DEMOLITION PHASE 1. The work of this 90 calendar day project consists, in general, of furnishing all labor, materials, tools, equipment, transportation, services and supervision required to demolish the dolphin and catwalk structure at Berth 67 in Howard Terminal, including, but not limited to: the removal and disposal of the existing dolphin and catwalk structure, removal of existing utilities and equipment, and performing all associated work, all in accordance with the Contract Documents.