Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
CA - Port of Oakland: HOWARD TERMINAL WHARF DEMOLITION PHASE 1. The work of this
January 26, 2025
10:01 AM
Avatar
Admin
Forum Posts: 7150
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Port of Oakland: HOWARD TERMINAL WHARF DEMOLITION PHASE 1. The work of this 90 calendar day project consists, in general, of furnishing all labor, materials, tools, equipment, transportation, services and supervision required to demolish the dolphin and catwalk structure at Berth 67 in Howard Terminal, including, but not limited to: the removal and disposal of the existing dolphin and catwalk structure, removal of existing utilities and equipment, and performing all associated work, all in accordance with the Contract Documents.

Get details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
113 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3048

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20151

Posts: 28385

Administrators: JOHN: 7602, John: 7150

Skip to toolbar