Port of Oakland: HOWARD TERMINAL WHARF DEMOLITION PHASE 1. The work of this 90 calendar day project consists, in general, of furnishing all labor, materials, tools, equipment, transportation, services and supervision required to demolish the dolphin and catwalk structure at Berth 67 in Howard Terminal, including, but not limited to: the removal and disposal of the existing dolphin and catwalk structure, removal of existing utilities and equipment, and performing all associated work, all in accordance with the Contract Documents.
Get details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
113 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3048
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20151
Posts: 28385
Administrators: JOHN: 7602, John: 7150