Port of Los Angeles CDBON: Terminal Island Facilities Demolition and Improvements. Project consist of 1050 S. Ways St. Starkist Demolition and Storage Lot Conversion, South Seaside Avenue Storm Drain Restoration, Southwest Marine Administration Building Demolition and Pavement Improvements, and 1025 S. Seaside Avenue Demolition and Lot Conversion. 1050 S. Ways St. Starkist Demolition and Storage Lot Conversion consists of demolition of buildings including asbestos abatement and lead remediation, structures, and timber dock associated with former Starkist Cannery, grading of site, installation of crushed miscellaneous base with stabilizing agent, and installation of permanent perimeter fencing and lighting for temporary equipment storage in accordance with Drawing No. 1-3391. South Seaside Avenue Storm Drain Restoration consists of construction of storm drain system in accordance with Drawing No. 1-3436. Southwest Marine Administration Building Demolition and Pavement Improvements consists of demolition, asbestos abatement, and lead remediation of 5,000 square feet wood framed building including foundation and grading and paving of site with asphalt concrete in accordance with Drawing No. 1-3455. 1025 S. Seaside Avenue Demolition and Lot Conversion consists of demolition, asbestos abatement and lead remediation of 10,500 square feet metal framed building including foundation, mechanical, and electrical equipment and grading and paving of site with asphalt concrete in accordance with Drawing No. 1-348
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
80 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19932
Posts: 28166
Administrators: JOHN: 7602, John: 6930