Port of Los Angeles CDBON: San Pedro Waterfront Berths 74-83 Promenade Phase II. Project consists of 30-foot wide public promenade, site remediation, and building demolition. Work includes but is not limited to landscaping, hardscaping, architectural finishes, guardrails, and lighting. Scope includes items such as demolition, asbestos abatement, lead remediation, installation of new piles, pier and deck structures, structural improvements, utilities, grading, soil characterization and remediation, soil remediation of a Los Angeles Regional Water Quality Control Board (LARWQCB) regulated site, light non-aqueous phase liquid (LNAPL)/water mix skimming, removal, and disposal, and other site improvements in accordance with Drawing Nos. 1-3410 and 1-3413.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
79 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950