Pier G Terminal Redevelopment. The Work required by this Contract includes furnishing all transportation, labor, materials, tools, equipment, services, testing, and incidentals to accomplish the PIER G, BERTHS G230-G236 TERMINAL REDEVELOPMENT, EAST TERMINAL BUILDING DEMOLITION AND SITE REDEVELOPMENT Project. Refer to Section 01110, Summary of Work, in the Technical Specifications for a more detailed description of the Work which includes, but is not limited to, the following: Supervision, coordination and project phasing to accommodate site water pollution control, potholing, building demolition, site demolition, utilities demolition, electrical substations demolition, reefer substation installation, storm drain construction, waterline construction and- - - Bids due 02/05
Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
143 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950