Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
CA - Port of Long Beach, 2 piers terminal buildings demolition w/hazmat
September 18, 2011
7:50 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

TERMINAL BUILDINGS DEMOLITION AT PIERS D AND E. Summary Description of the Work. The Work required by this Contract includes, but is not limited to, the following: 1. Abate hazardous materials before the demolition of the buildings designated to be removed. 2. Sawcut, remove, and dispose of existing asphalt concrete and Portland cement concrete pavement to Port Asphalt and Concrete Recycle Area. 3. Remove and legally dispose of buildings, loading docks, platforms, canopies, guard posts, slabs, ramps, foundations, retaining walls, electrical, utilities, emergency power generators, and miscellaneous appurtenances in their entirety off-site. Deliver sewer lift station control panels and pumps to Port Maintenance Yard. 4. Disconnect underground utilities. 5. Backfill and compact fill material. 6. Haul, place, and compact Port furnished crushed miscellaneous base. 7. Install guard posts. Bids due 10/18

Find complete details to this bid and more nationwide at envirobidnet.com click on link below - try a FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
72 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3034

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19832

Posts: 28066

Administrators: JOHN: 7602, John: 6829

Skip to toolbar