Pleasant Hill Community Center Demolition Project. The Work consists of, but is not limited to: obtaining all required permits (demolition, grading, encroachment, fire, etc.); preparing a waste management plan; preparing a traffic control plan; installation of temporary fencing; installing erosion control measures; providing all temporary power and utilities to perform the Work; providing temporary shoring (if needed); removing trees and grinding stumps/roots; protecting trees that will remain; capping underground utilities and irrigation lines; removing underground utility and irrigation lines; demolition of multiple story buildings, including below ground foundations and structures; rough grading the site Bids due 09/07
Find complete details to this bid and more nationwide at envirobidnet.com click on link below - try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online: John
75 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19932
Posts: 28166
Administrators: JOHN: 7602, John: 6930