PETALUMA: CORPORATION YARD TANK DEMOLITION: PHASE 2. The WORK includes Demolition of existing waste water treatment facilities including Primary Digester, Secondary Digester, Plant Effluent Control Box, and Chlorination Building to a minimum depth of 4 feet below grade. Fill of subsurface voids with controlled low strength material, subbase fill with compacted Class 2 aggregate base and surface asphalt paving. Furnish and install site fence replacement and temporary fencing to secure and reconfigure area. Selective interior demolition within existing Laboratory building to remove laboratory cabinetry fixtures and asbestos containing floor tiles. Work in vicinity of Interim Housing Project to be coordinated in schedule and staging.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
116 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950