CA - Palos Verdes: 12 MW power plant demolition and 2 field trailers
January 27, 2013
11:08 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Sanitation Districts of Los Angeles County: PALOS VERDES LANDFILL POWER PLANT DEMOLITION. The work includes, but is not necessarily limited to, the following: demolition of a 12 MW power plant with selective demolition of the cooling tower and remodeling of the control room; installation of new electric utility equipment including 480V substation and 800kW stationary emergency generator; abandonment of an existing 18-inch storm drain lateral using confined space entry; construction of approximately 180 linear feet of new 21-inch storm drain lateral; demolition of two (2) field office trailers with on-site transportation of contents; placement of approximately 350 square yards of asphalt concrete; and all appurtenant work. Bids due 03/05

Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
80 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar