Palm Springs: SPC Bridge Replacement - The work comprises of the demolition and reconstruction of the bridge over Tahquitz Creek Channel, reconstruction of channel slopes, street reconstruction of South Palm Canyon Drive from E. Sunny Dunes Road to approximately 900 feet south of E. Sunny Dunes Road consisting of curb and gutter, sidewalk, storm drain, and landscaped medians and parkways, singing and striping, Traffic Signal improvements, installation of temporary traffic signals for a construction detour, and installation of a 16” Domestic Waterline
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
103 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3046
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20111
Posts: 28345
Newest Members:
Natalie Francis, Winwin, Green, NORMAN MICHAEL ARTHUR, DougAdministrators: JOHN: 7602, John: 7110