Seismic Retrofit of Coliseum Way Bridge over Damon Slough. Description: The proposed work consists, in general, of bridge seismic retrofit. Said work consists of, but is not limited to, bridge removal, structural excavation and backfill, structural concrete, furnishing and driving cast-in-steel shell (CISS) concrete piles, drilling and doweling, reinforcement steel and miscellaneous metal work, environmental protection, traffic control, and other work specifically shown on the plans or included in the specifications and these special provisions. Bids due 12/06
Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
69 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3042
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20052
Posts: 28286
Newest Members:
Doug, David Groves, David Groves, Arthur Smiths, BUTRUS WOLAdministrators: JOHN: 7602, John: 7050