Replacement of Embarcadero Bridge over Lake Merritt Channel. Description: The proposed work consists, in general, of the bridge replacement. Said work consists of, but is not limited to, bridge removal, structural excavation and backfill, grading, structural concrete, furnishing and driving cast-in-drilled hole concrete piles, reinforcement steel and miscellaneous metal work, new restroom building, environmental protection, traffic control and other work specifically shown on the plans or included in the specifications and these special provisions. DBE Goal: 9.79% License Required: A Trucking Required[ch1] : No Engineer's Estimate: Base Bid $15,994,200.00 Basis of Award[ch2] : The lowest base bid price Bonds: 10% Bid Security; 100% Payment and Performance Bonds Contract Working Days: 425 days except plant establishment work 615 days including plant establishment work Liquidated Damages: $6,000 per calendar day Pre-Bid Meeting: Deadline for Questions:April 29, 2014 at 2:00 p.m. by email to the Project Manager. It is the Contractor's responsibility to ensure that the email is received by the Project Manager. Bid Deadline: May 8, 2014 at 2:00 p.m. Bids not received by the Office of the City Clerk, by the deadline will be returned unopened. Contact Information: Project Manager Bids due 05/08
For details to this bid and hundreds more nationwide, go to http://www.envirobidnet.com - Take a free 30 Day Trial!
Most Users Ever Online: 429
Currently Online:
64 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3043
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20071
Posts: 28305
Administrators: JOHN: 7602, John: 7070