Los Angeles: Wilmington Waterfront Promenade and Building Demolition. The Project consists of construction of open green space, a public plaza, parking courts, and 1,200 linear feet of waterfront promenade. Work includes but is not limited to realignment of Water Street, reconstruction of the seawall at Berths 182 to 186, asbestos abatement and lead remediation of 10 buildings, rock revetment reconstruction, installation of steel sheet pile wall, installation of prestressed concrete piles, landscaping, hardscaping, construction of restrooms, lighting, striping, asphalt concrete paving, and playground construction in accordance with Drawing Nos. 1-3192 and 1-3379. Engineering Estimate: $41,000,000 - $46,000,000.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
19 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950