Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
CA - Hayward: Library and site demolition
June 7, 2015
7:49 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Hayward: 21st Century Library and Community Learning Center and Heritage Plaza Arboretum Project. Project Description: The work consists, in general of a 3-story new library building (58,000 SF) and its related site work. The project will be constructed in two (2) phases. Phase 1 includes construction of the new Net Zero Energy library building and building systems, library site work, Municipal garage improvement (stairs, new elevator, photovoltaic systems, plumbing, stormwater collection) and C Street improvement (utilities, lighting, streetscape, traffic signal modification). Phase 2 includes demolition of the existing library building and plaza site elements for the construction of the plaza site (landscaping, irrigation, civil, utilities, lighting, rainwater catchment and cistern system) and other work required by the drawings and specifications. Bids due 06/30

Details to this bid & hundreds more nationwide at http://www.envirobidnet.com Free 30 Day Trial – 15% discount for DF members if you subscribe (enter code D0246 when taking at trial to qualify)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
84 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar