Glendale: SITE DEMOLITION. CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIALS AND LABOR TO PROVIDE THE FOLLOWING SERVICES: 7.1 SAW CUT ASPHALT AT PERIMETER OF DEMOLITION AREA, REMOVE AND DISPOSE OF SUBTERRANEAN STRUCTURE INCLUDING CONCRETE FLOOR, STAIRS, STEM WALLS, BEAMS, CEILING, ANY ELECTRICAL, OR INSULATION. 7.2 CONTRACTOR SHALL REMOVE ALL DEMOLITION DEBRIS AND GRUB SITE CLEAN INCLUDING ALL EXPOSED SOIL. 7.3 CONTRACTOR SHALL BACKFILL PIT WITH CLEAN FILL DIRT TO 95% COMPACTION. COMPACTION SHALL BE DONE CONTINUOUSLY WITH PROPER MOISTURE CONTENT WHILE PIT IS BEING BACKFILLED. 7.4 CONTRACTOR SHALL RETAIN A LICENSED SOILS ENGINEER TO VERIFY COMPACTION. CONTRACTOR MAY CHOOSE TO BACKFILL WITH THREE SACK SLURRY. 7.5 CONTRACTOR SHALL INSTALL FOUR INCHES OF MACHINE ROLLED ASPHALT PAVING OVER FOUR INCHES OF COMPACTED CMB BASE. 7.6 CONTRACTOR SHALL COORDINATE ALL EXCAVATIONS WITH DIGALERT. 7.7 CONTRACTOR SHALL PROVIDE ALL NECESSARY BARRIERS, SIGNS, AND SHORING TO PERFORM THE DEFINED SCOPE OF WORK. 7.8 CONTRACTOR SHALL COMPLETE ALL ON-SITE WORK WITH TEN (10 CONSECUTIVE CALENDAR DAYS. WORK HOURS SHALL BE 7:00 AM TO 5:00 PM, MONDAY THROUGH FRIDAY. EXTENDED AND WEEKEND HOURS MAY BE APPROVED AT THE DISCRETION OF THE CITY'S PROJECT MANAGER. 7.9 CONTRACTOR SHALL MAINTAIN THE SITE, INCLUDING DRIVE PATHS CLEAN AND CLEAR AT ALL TIMES. 7.10 C-21 CONTRACT LICENSE REQUIRED
Details to this demo bid & hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card needed)
Most Users Ever Online: 429
Currently Online:
24 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3047
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20111
Posts: 28345
Administrators: JOHN: 7602, John: 7110