Garden Grove: =NORTHWEST CORNER HARBOR BOULEVARD AND TWINTREE AVENUE SITE (B-2 SITE)”DEMOLITION PROJECT. The project consists of demolition work as Follows: The demolition and removal of concrete and asphalt material from vacated public street. Dust control and stormwater runoff control during operations will be of utmost importance. The contractor shall rip and grade the site to provide positive drainage from the site. Please refer to the contract documents for more details. The project generally includes: 1. Preparation and implementation of Stormwater Pollution Prevention Plan (SWPPP); 2. Implement/Install BMPs/Erosion Control/Steel Rumble Plates; 3. Mobilization; 4. Clear and Grub the Site; 5. Remove and dispose of asphalt, concrete curb and gutter, non-perimeter fencing, light standard, miscellaneous piping; 6. Scarify (rip) site 1' below grade; 7. Knock down site; 8. Cap sewer line(s); 9. Cover and install 3/4" CMB gravel, 2” thick on entire Project Site; 10. Demobilize, and 11. Identify all exclusions. 12. No herbicides shall be used.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
58 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950