Fresno: Requirements Contract for Emergency Demolition of Structures. In accordance with the foregoing specifications, the scope of work includes emergency demolition of structures, removal of foundations, flatwork, demolition debris, backfill/compaction of foundation area, and removal of trees, weeds, etc., leaving a clean and level vacant lot. As this is a Requirements Contract for emergency demolition of structures, demolitions will be conducted on an as-needed basis during the contract period. The scope of each individual emergency demolition will depend on the conditions creating the imminent threat to life, health, safety, or adjacent property. In order to eliminate the imminent threat, the demolition may include some or all of the items set forth in the Scope of Work. This will be determined at each demolition site by the Project Manager/Associate Environmental and Safety Consultant. 24/7 availability and maximum 90-minute response time to work sites for emergency demolition services when needed. Temporary fencing installed around demolition site when necessary. Temporary road closures conducted in accordance with all state and local requirements when necessary.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
84 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950