Elk Grove: Structure Demolition Project 2018 (WCE027/WTR027/WDR037/WCC017). The proposed work shall be performed in accordance with the plans, specifications and other contractdocuments and shall consist of the following: demolish structures and appurtenant facilities on parcels owned bythe City of Elk Grove in preparation for future CIP projects. The properties are 8485 Poppy Ridge Road – APN132-0290-004, 8675 Poppy Ridge Road – APN 132-0290-009, 8681 Poppy Ridge Road – APN 132-0290-037, 8775Poppy Ridge Road - APN 132-0290-030, 8663 Kammerer Road – APN 132-0320-001, 7809 Kammerer Road –APN 132-0300-012, 7909 Kammerer Road – APN 132-0300-014, 8051 Kammerer Road – APN 132-0300-016,8011/8019 Kammerer Road – APN 132-0300-015. The Project will also include the demolition of an abandonedwell located at 9697 Johnston Road north of the Civic Center property (Work).The Opinion of Probable Cost (OPC) for the work is $505,000.00
Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
36 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950