CA - El Dorado Irrigation District: (RFQ) Flumes 4, 45 Section 3, 45A, 46A, 47A, 47B, 52A, and Spill 3 Crib Wall. The anticipated work of the Projects generally consists of:
December 31, 2023
8:59 AM
Avatar
Admin
Forum Posts: 7030
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

El Dorado Irrigation District: (RFQ) Flumes 4, 45 Section 3, 45A, 46A, 47A, 47B, 52A, and Spill 3 Crib Wall. The anticipated work of the Projects generally consists of: Flume 4 • This project consists of replacing a 400-foot section of elevated flume • Flume replacement includes flume demolition and disposal, excavation, grading, subsurface drainage, and constructing mechanically stabilized earth (MSE) walls • Installation of rock anchors, rock dowels, and/or soil nails • Erosion control implementation and maintenance • Removal of loose material and hazard tree removal • Constructing mechanically stabilized earth (MSE) walls • Contractor must have experience in the construction of MSE walls, air placed concrete, and working in remote and steep mountainous locations in all weather conditions • Work may need to be done by helicopter • This project is not currently scheduled for construction • Current estimate for this project is $10.0 million Flume 45 Section 3 • This project consists of replacing a 942-foot section of elevated flume • Flume replacement includes flume demolition and disposal, excavation, grading, subsurface drainage, and constructing mechanically stabilized earth (MSE) walls • Installation of rock anchors, rock dowels, and/or soil nails • Erosion control implementation and maintenance • Removal of loose material and hazard tree removal • Constructing mechanically stabilized earth (MSE) walls • Contractor must have experience in the construction of MSE walls, air placed concrete, and working in remote and steep mountainous locations in all weather conditions • This project is not currently scheduled for construction • Current estimate for this project is $11.0 million Flume 45A • The project consists of replacing a 100-foot fiberglass lined elevated wood flume with cast-in-place, pre-cast box culverts, or trapezoidal flume sections Constructing mechanically stabilized earth (MSE) bench • Flume replacement includes flume demolition and disposal, excavation, grading, subsurface drainage, and constructing mechanically stabilized earth (MSE) walls • Installation of rock anchors, rock dowels, and/or soil nails • Erosion control implementation and maintenance • Removal of loose material and hazard tree removal • This project is not currently scheduled for construction • Current estimate for this project is $1.5 million Flume 46A • The project consists of replacing a 128-foot elevated wood flume with cast-inplace, pre-cast box culverts, or trapezoidal flume sections constructing mechanically stabilized earth (MSE) bench • Flume replacement includes flume demolition and disposal, excavation, grading, subsurface drainage, and constructing mechanically stabilized earth (MSE) walls • Installation of rock anchors, rock dowels, and/or soil nails • Erosion control implementation and maintenance • Removal of loose material and hazard tree removal • This project is not currently scheduled for construction • Current estimate for this project is $2.0 million Flume 47A • The project consists of replacing a 201-foot elevated wood flume with cast-inplace, pre-cast box culverts, or trapezoidal flume sections constructing mechanically stabilized earth (MSE) bench • Flume replacement includes flume demolition and disposal, excavation, grading, subsurface drainage, and constructing mechanically stabilized earth (MSE) walls • Installation of rock anchors, rock dowels, and/or soil nails • Erosion control implementation and maintenance • Removal of loose material and hazard tree removal • This project is scheduled to bid late February/early March of 2024 with construction in the summer of 2024 • Current estimate for this project is $2.4 million Flume 47B • The project consists of replacing a 128-foot elevated wood flume with cast-inplace, pre-cast box culverts, or trapezoidal flume sections constructing mechanically stabilized earth (MSE) bench • Flume replacement includes flume demolition and disposal, excavation, grading, subsurface drainage, and constructing mechanically stabilized earth (MSE) walls • Installation of rock anchors, rock dowels, and/or soil nails • Erosion control implementation and maintenance • Removal of loose material and hazard tree removal This project is not currently scheduled for construction • Current estimate for this project is $2.0 million Flume 52A • The project consists of replacing a 377-foot elevated wood flume with cast-inplace, pre-cast box culverts, or trapezoidal flume sections constructing mechanically stabilized earth (MSE) bench • Flume replacement includes flume demolition and disposal, excavation, grading, subsurface drainage, and constructing mechanically stabilized earth (MSE) walls • Installation of rock anchors, rock dowels, and/or soil nails • Erosion control implementation and maintenance • Removal of loose material and hazard tree removal • This project is not currently scheduled for construction • Current estimate for this project is $2.0 million Spill 3 Crib Wall • Removal of wood, concrete, and metal structures associated with spillway, canal, and crib wall • The material is anticipated to be removed by helicopter. Previous helicopter experience in remote mountainous locations is required. • Canal replacement includes demolition and disposal, excavation, grading, subsurface drainage, and constructing mechanically stabilized earth (MSE) walls up to 25 feet in height • Stabilization of large area of destabilized soil • Removal of loose material, rock scaling, and hazard tree removal • Installation of rock anchors, rock dowels, and/or soil nails • Erosion control implementation and maintenance • This project is not currently scheduled for construction • Current estimate for this project is $3.5 million

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
52 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar