Corona: DEMOLITION OF ARMORY BUILDING AT CITY PARK. The Project generally consists of the demolition and disposal of four (4) buildings/storage containers, including but not limited to the existing hardscape and flatwork, utility disconnection/removals, pest abatement, abatement of hazardous materials, miscellaneous removals, and fill and compaction as necessary to clear the site and leave the existing site flush to surrounding surface elevations. This project does involve hazardous material abatement of lead and asbestos.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
66 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950