Contra Costa Water District: Chenery Tower Demolition. Work, in general, consists of mobilization and demobilization, equipment staging, the demolition and off-site disposal of the obsolete Chenery Tower (and associated outlet works) at the north embankment of the Mallard Dam, removal and off-site disposal of the adjacent bridge that connects the embankment to the tower, and isolation and abandonment of two parallel, 24-inch concrete pipes beneath the tower that penetrate the dam embankment (including associated excavation). A turbidity curtain shall be deployed around the demolition site to preserve reservoir turbidity outside of the demolition area. Water collected from the two parallel, 24-inch concrete outlet pipes shall be treated with a sediment settlement tank to remove silt prior to being pumped back into the reservoir.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
79 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950