Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
CA - COMPTON UHSD: (RFQ) Abatement & Demolition at Compton High School
March 29, 2020
9:15 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

COMPTON UHSD: (RFQ) Abatement & Demolition at Compton High School. The District is seeking to prequalify contractors with the following licenses that intend to bid as a general contractor (prime contractor) directly to the District: Class B General Building Contractor C21 - Building Moving/Demolition Contractor C22 - Asbestos Abatement Contractor HAZ - Hazardous Substance Removal Certification Completion of Prequalification Application A Prequalification Application is available through QualityBidders.com. Interested parties are required to fully and completely respond to the materials in the Prequalification Application available at http://QualityBidders.com, and then click on the "Pre-Qualification" tab. Any prospective bidder who does not submit the required information using the Prequalification Application and/or any attempt to use an alternative form by a bidder shall be disregarded by the District. All blanks and requested information in the Prequalification Application must be appropriately filled in and all required documents and attachments must be provided. Project includes, but is not limited to, the following: This project generally consists of abatement of hazardous materials, building demolition of building structures, selective demolition and the salvaging of miscellaneous materials and equipment to be determined by the District. All foundations located within the building footprint and all utilities beyond 5-ft of the building footprint shall remain in place. This project does not include any new construction or modernization or removal of building foundations or utilities. Please see Table 1 and Table 2 below. This project specifically excludes new construction, modernization, demolition or removal of building foundations, demolition or removal of utilities outside the 5-ft building footprint perimeter

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
37 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar