Utility Infastructure Upgrade (Energy) HVAC/EMS Efficiency Project Asbestos. The work under this contract will be in 2 phases. First phase (Buildings 800 & 1500) will be performed during Winter break of 2014 and second phase (Buildings 100, 500, 700, 1400, 1600 & 1700) will be performed during Summer of 2015 which includes, but not limited to, the removal of existing HVAC unit at Building 1600, Dry Wall, TSI/Duct Seam Tape, Lead, Gypsum Board Ceiling, and 2�x4� false ceiling panels. Demolition, removal, and disposal of all asbestos containing materials detailed in the Asbestos Abatement Specifications for Solano Community College, and as indicated on HMS front end documents, HMS and Kleinfelder reports. All work to be performed is under a single prime contract. Bids due 11/05
For details to this bid and hundreds more nationwide see: http://www.envirobidnet.com Take a free 30 day trial (no credit card required)
Most Users Ever Online: 429
Currently Online:
73 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950