San Juan Unified School District: (RFQ) Design and construction services for the demolition of the existing administration building and the construction of a new 10,000 sf Administration building in its footprint along with a major renovation (complete interior demolition to structure) and re-purpose of the existing 7,000 sf Library/Counseling Center into a new Student Union which shall be opened up to the student quad for an indoor-outdoor flow at Casa Roble High School (Project). Site development may include the modification/removal of the CMU walls with ornamental fencing to open up the flow and view of the campus. Underground utility replacement and ADA path of travel as required by DSA will also be part of this project. Lastly, the project may also include a major renovation of Building A to accommodate a potential Career Technical Education (CTE) Biomed Program as part of the school's SCORE Academy.
Detailed information for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
76 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090