Bakersfield: DEMOLITION OF IMPROVEMENTS AT: 100 Dunlap Street, 101 Dunlap Street, 104 Dunlap Street, 108 Dunlap Street, 136 Dunlap Street, 5091 Easton Drive, 4304 Joseph Drive, 3201 Mona Way, 109 Morrison Street and 4504 Woodlake Drive. Phase 17 The work to be performed consists, in general, of demolition of improvements at 100 Dunlap Street, 101 Dunlap Street, 104 Dunlap Street, 108 Dunlap Street, 136 Dunlap Street, 5091 Easton Drive, 4304 Joseph Drive, 3201 Mona Way, 109 Morrison Street and 4504 Woodlake Drive, and the removal of all structures, foundations, landscaping, walls, fences where designated, debris, out buildings, swimming pools, septic tanks/leach fields, AC/PCC parking lots, sidewalks and patios, asbestos or lead containing materials, site grading to match adjacent grades and application of soil erosion measures. ENGINEERS ESTIMATE: $246,000.00.
Details to this bid and hundreds more nationwide at http://www.envirobidnet.com – take a 30 DAY FREE TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
86 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090