Bakersfield: DEMOLITION OF IMPROVEMENTS AT: 800 Wible Road (Phase 25) The work to be performed consists, in general, of demolition and removal of improvements commercial building at 800 Wible Road, including all structures, foundations, landscaping, walls, fences where designated, debris, out buildings, septic tanks/leach fields, basements, AC/PCC parking lots, sidewalks and patios, asbestos or lead containing materials, site grading to match adjacent grades and application of soil erosion measures. ENGINEER'S ESTIMATE: $71,400.00
Detailed information for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
92 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090