Pier 5 Historic Crane Demolition and Removal. The crane is a 60-foot tall steel framed trussed tower on a 17-feet by 30-feet wheel base supported by concrete girder beams, pile caps and concrete piles. Due to severe deterioration, corrosion and overall poor physical condition and structural integrity the decision has been made to have the structure removed in its entirety. PROJECT DESCRIPTION The purpose of the Project is for demolition and removal of the entire historic crane structure down to its girder beam supports. The work includes removal, transportation, waste characterization and disposal of all lead and asbestos containing material Bids due 08/31
For details to this bid and hundreds more nationwide go to, http://www.envirobidnet.com – Take a free 30 Day Trial (no cc required)
Most Users Ever Online: 429
Currently Online: John
97 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950