Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
CA - AIRPORT DEMOLITION - PHASE 1
November 9, 2014
6:00 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

. The Work comprises abatement, removal and disposal (remediation) of Asbestos Containing Materials (ACM), lead-based paint and lead containing materials, and other hazardous building materials; and the demolition, removal, and disposal of existing structures located at the City Municipal Airport and designated for removal by the City. The scope of work will include: securing the sites; utility coordination; remediation of ACM, lead-based paint, and other hazardous building materials; disconnection and capping of all plumbing, gas lines, waste and water piping, electrical wiring and all other utilities to the source; demolition and removal of various trailers, offices, airport hangers, patio covers, restaurant building, and accessory structures as identified in the Special Provisions; recycling of non-hazardous materials; transportation and legal disposal of all debris; cleanup of the site; and all associated work Bids due 12/04

For details to this bid and hundreds more nationwide see: http://www.envirobidnet.com Take a free 30 day trial (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
45 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar