Yuma: Fleet Services Maintenance Shop. Scope of Work: The work consists of demolition of the existing on-site structures, including asbestos abatement. Construction of a sanitary sewer, with tie-ins to the Fleet shop. Construction of approximately 40,000 square feet, one story conventional painted concrete tilt-up structure w/steel roof joist and metal framing. The fleet yard is surrounded by a masonry wall and is secured by fencing. Budget: $7,800,000.00
Details to this bid and hundreds more nationwide at http://www.envirobidnet.com – take a 30 DAY FREE TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
49 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090