Show Low: City Park Regional Detention Project. Work includes, but is not necessarily limited to, installing an approximately 70,000 CF detention basin at the convergence of drainage channels in the City Park. The work includes excavating material for the detention basin and removing it from the site, installing an outlet structure with piping, a new pedestrian bridge for the walking path, water and sewer service relocations, and seeding. The work includes all required labor, material, incidentals, transportation, traffic control, and services required for the project to complete a usable and operable facility in accordance with all pertinent codes and regulations as necessary to complete the job in a workmanlike manner as shown on the Construction and Bid Documents. The work shall take place in the Show Low City Park in Show Low Arizona.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
74 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19932
Posts: 28166
Administrators: JOHN: 7602, John: 6930