Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
AZ - Prescott Regional Airport: Taxiway C Relocation and Hot Spot No. 3 and 4 Mitigation Project.
April 5, 2020
9:12 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Prescott: Prescott Regional Airport Taxiway C Relocation and Hot Spot No. 3 and 4 Mitigation Project. This project includes the relocation of Taxiway C, adjusting and upgrading lighting and signage infrastructure along Taxiway C, and mitigating Hot Spots 3 & 4 at Prescott Regional Airport (PRC). Major elements of work include with approximate quantities (actual quantities are included in the Bid Schedule within the contract documents): Base Bid - Demolition of existing, variable depth taxiway pavement 30,000 square yards; demolition of taxiway lights, signs and associated infrastructure; Demolition of existing storm drain infrastructure; Earthwork 40,000 cubic yards (cut), 800 cubic yards (fill); New Asphalt Concrete (AC) Taxiway Pavement (FAA P-401) 17,000 square yards; New Asphalt Concrete (AC) Shoulder Pavement (FAA P-403) - 8,000 square yards; New crushed Aggregate Base Course (ABC) (FAA P-209) 24,000 square yards; Lime-Treated Subgrade under structural taxiway pavement (FAA P-155) 24,000 square yards; New pavement markings (FAA P-620) 13,000 square feet; New LED taxiway lights, signs and associated infrastructure. Additive Alternate No. 01: Demolition of existing, variable depth taxiway pavement 75,000 square yards; Demolition of taxiway lights, signs and associated infrastructure; Demolition of existing storm drain infrastructure; Earthwork 80,000 cubic yards (cut), 50,000 cubic yards (fill); New Asphalt Concrete (AC) Taxiway Pavement (FAA P-401) 54,000 square yards; New Asphalt Concrete (AC) Shoulder Pavement (FAA P-403) 27,000 square yards; New crushed Aggregate Base Course (ABC) (FAA P-209) 76,000 square yards; Lime-Treated Subgrade under structural taxiway pavement (FAA P-155) --76,000 square yards; New pavement markings (FAA P-620) 35,000 square feet; New LED taxiway lights, signs and associated infrastructure; New REILs on Runway 3L-21R (both ends).

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
79 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar