The proposed work consists of removing the existing seven span steel girder bridge and replacing it with a new nine span reinforced concrete closed-frame bridge. Additional work includes roadway widening, scour retrofit, guardrail replacement, approach slab construction, pavement marking replacement, and other miscellaneous work. TRACS NO 077 PN 123 H796901C PROJ NO STP-077-A(206)T TERMINI TUCSON-ORACLE JCT-GLOBE HWY (SR 77) LOCATION ARAVAIPA CREEK BRIDGE The amount programmed for this contract is $4,200,000. The proposed work is located in Pinal County, on SR 77, between milepost 123.37 and milepost 123.68, approximately 15 miles north of the Town of Mammoth Bids due 01/17/14
Find details to this bid and more you may be missing nationwide at envirobidnet.com (click below) try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
81 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950