Harrison: Demolition of Selected Structures at the Old Harrison Junior High School Campus. The work generally consists of furnishing all plant, labor, material, and performing all work required to demolish four (4) structures as identified in the bid documents. Demolition includes removal of the identified structures, miscellaneous debris associated with the structures, and all foundations and slabs. The Contractor shall be responsible for all utility disconnections. The property is to be graded to a level condition
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
111 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950