Harrison: Demolition of Selected Structures at the Old Harrison Junior High School Campus. The work generally consists of furnishing all plant, labor, material, and performing all work required to demolish four (4) structures as identified in the bid documents. Demolition includes removal of the identified structures, miscellaneous debris associated with the structures, and all foundations and slabs. The Contractor shall be responsible for all utility disconnections. The property is to be graded to a level condition