Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
AL - Birmingham, imaging center renovation, selective demolition
January 23, 2011
4:48 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Demolition for University of AL WTI Basement Imaging Center Renovation. The general description of work includes: Scope: The project is comprised of the selective Demolition of the Basement Level of the Wallace Tumor Institute including existing offices, laboratories, laboratory support spaces and mass concrete vaults within the existing building shell. The project includes the removal of interior concrete vault walls and ceilings, masonry walls, gypsum board assemblies, the selective removal of mechanical, plumbing, electrical, and fire protection systems and the removal of laboratory casework as set forth in the Project construction documents. The project also includes the protection of the above components indicated to remain and precautions for infection control in an occupied building. Work includes: management, general safety and security of the demolition and construction areas and other items de- scribed in the project plans and specifications Bids due 01/28
Find complete details to this bid and more nationwide at envirobidnet.com FREE 30 DAY TRIAL click on link below

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
48 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar