Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
AL - Birmingham, demolition of 10th fl of office bldg
December 4, 2011
5:49 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

University of Alabama at Birmingham: Demolition of the 10th Floor of the Sparks Center. SCOPE OF WORK: The project includes selective Demolition of the 10th Floor of the Sparks Center including existing offices, laboratories, and laboratory support spaces from the existing building core to the existing building shell. Contractor will remove interior masonry walls and gypsum board assemblies, selectively remove mechanical, plumbing, electrical and fire protection systems, remove and relocation of selective laboratory equipment, and casework as set forth in the Project construction documents. Bids due 12/16

Find complete details to this bid and more nationwide at envirobidnet.com click on link below - try a FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
94 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar