Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
AK - Valdez, dike demolition addendum
March 13, 2011
6:48 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Addendum#3 Lowe River Dike Renovation Project Number: 11-310-8060 Contract Number: 966 This Project includes, but is not necessarily limited to: Providing all labor, materials, tools, equipment, transportation, survey, environmental protection, demolition, excavation, compaction, rip rap, classified fill, supervision and facilities necessary to: Construct approximately 1300 linear feet of new flood control dike between Groin 1 & 3. Enlarge approx. 2300 ft. of existing Groin 1, enlarge approx. 1800 ft. of existing Groin 2 and construct 2 turnarounds. The project also includes constructing a gravel access road, turnarounds, access ramps, a concrete flood control gate structure, fences, installing culverts with fish passage lining materials, providing a detailed as-built survey, and other items. The project may be completed in several stages at the direction of the City

Find complete details to this bid and more nationwide at envirobidnet.com FREE 30 DAY TRIAL click on link below (special discount available to forum members, code no: 0246)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
53 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar