Seward: Seward Harbor G, K, L Dock Replacement Project.The City of Seward desires to receive bids from contractors to construct the Seward Harbor G, K, L, Dock Replacement Project in the Small Boat Harbor Seward, Alaska. The City of Seward wishes to enter into an agreement with a qualified, experienced contractor familiar with waterfront construction to complete the work as outlined in the plans and specifications. The scope of work generally includes demolishing existing K and L and a portion of G floating docks, furnishing and installing new K and L and a portion of G floating docks, furnishing and installing new galvanized steel piling, furnishing and installing piped potable water and fire protection systems, furnishing and installing electrical power and lighting systems and other associated work. Due to the heavy public use of the Seward Harbor in the summer months, no on site work will be allowed between May 1 and September 15. The Department of the Army permit requires that pile installation, removal, and dredging activities take place between October 1 and March 31 of each year to minimize impacts to larval and juvenile fish species. All work under this contract must be completed by April 30, 2022.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
115 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950