Old Mill Subdivision Demolition and Restoration. The project consists of the following: Demolish and/or remove four (4) each housing structures, and all outbuildings, cabins, and foundation systems; demolition and remove three (3) existing fuel tank system and limited soils if fuel contamination is discovered; demolition and/or decommissioning five (5) existing wells; demolition and/or remove five (5) each existing septic tanks and systems; backfill and regrade five (5) each building sites and roads and parking areas and install new topsoil, seed, and water, per all plans and specifications for the following lots: Lots 1 and 2 Block 2, Lots 1 and 2 Block 3, Lot C1, Lot 1A, Block 1. Bids due 05/17
Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
89 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3042
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20032
Posts: 28266
Newest Members:
Doug, David Groves, David Groves, Arthur Smiths, BUTRUS WOLAdministrators: JOHN: 7602, John: 7030