Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
AK - Seward: multiple building demolitions w/tanks and contaminated soil
April 22, 2012
5:56 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Old Mill Subdivision Demolition and Restoration. The project consists of the following: Demolish and/or remove four (4) each housing structures, and all outbuildings, cabins, and foundation systems; demolition and remove three (3) existing fuel tank system and limited soils if fuel contamination is discovered; demolition and/or decommissioning five (5) existing wells; demolition and/or remove five (5) each existing septic tanks and systems; backfill and regrade five (5) each building sites and roads and parking areas and install new topsoil, seed, and water, per all plans and specifications for the following lots: Lots 1 and 2 Block 2, Lots 1 and 2 Block 3, Lot C1, Lot 1A, Block 1. Bids due 05/17

Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
89 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar