Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
AK - Lower Kuskokwim School District: Early Site Work and Piles for the Ayaprun Replacement School
June 13, 2021
9:22 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Lower Kuskokwim School District: Early Site Work and Piles for the Ayaprun Replacement School at the LKSD main campus in Bethel, Alaska. Activities are planned to begin immediately upon award. The Project consists of: * The abatement and demolition of existing site boardwalks, connexs, site utilities, small housing structure and miscellaneous site debris, * The procurement and installation of piles related to the construction of an approximately 53,640 gsf new school and identified adjacent support buildings – generally identified as package 1A. * The procurement and installation of piles related to the construction of the foundation for a campus wide fire pump house generally identified as package 1B also identified as add alternate #1. * Final grading for a designated area including all areas under the building footprint and other pile foundations. * Project coordination with adjacent construction projects, including, but not limited to: DOT Ridgecrest Improvements, LKSD Infrastructure Improvement Projects at the LKSD Campus, City of Bethel and AVEC line extension, * The relocation of the construction excavation fill to location(s) on the LKSD Main Campus site and designated storage locations, * SWPP development and maintenance for all areas of excavation and fill. * Seeding and plantings for soil stabilization and provision of additional soil stabilization methods as indicated. * Temporary connection for continued use of exterior crosswalk lighting. * Access coordination for the adjacent LKSD Campus Facilities that will be in use during construction, including parking, bus routes and pedestrian connectivity. * Provisions for the security of the construction site including fencing to become property of the owner for continuation of construction activities after the work of this contract is completed.

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
83 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar