Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
AK - Kodiak: demolition and disposal of the existing dock system, including bulkhead, gangway, dock and pilings
January 11, 2015
6:40 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Installation of the Anton Larsen Bay Dock, Kodiak, Alaska. The Scope of Work includes handling, transportation and installation of three (3) ; mooring floats and one (1) 6' wide by 80' long gangway at the Anton Larsen Bay Dock location. The floats and gangway will be fabricated under a separate contract and stored at a location in Kodiak. The work also includes procurement, transportation and installation of all other components as shown in the documents and as necessary for a complete dock installation, including piling systems, landside improvements and other elements. The work also includes demolition and disposal of the existing dock system, including bulkhead, gangway, dock and pilings. Bids due 02/3

For details to this bid and hundreds more nationwide go to http://www.envirobidnet.com take a Free 30 day trial (no credit card needed) 15% discount for DF members if you subscribe after the free trial. (to qualify for discount use code D0246 when taking a trial)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
84 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar