Berths I and II 2010 / 2011 Interim Timber Dock Repairs. Description: This project consists of all work necessary for the Berths I and II 2010 /2011 Interim Timber Dock Repairs. Specific items of work include, but are not limited to, demolition and disposal of existing marine treated timber piles; installation of 16-inch steel pipe piles through an existing timber deck; new pile connections to existing timber piles and new steel piles; repairs to existing timber pile caps, replacement and/or addition of new timber stringers and replacement of portions of the timber deck as noted and as required for the installation of the above work Bids due 01/25
Find complete details to this bid and more nationwide at envirobidnet.com FREE 30 DAY TRIAL click on link below
Most Users Ever Online: 429
Currently Online:
73 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19932
Posts: 28166
Administrators: JOHN: 7602, John: 6930