Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
AK - Ketchikan, dock timber pile demolition
January 15, 2011
6:50 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Berths I and II 2010 / 2011 Interim Timber Dock Repairs. Description: This project consists of all work necessary for the Berths I and II 2010 /2011 Interim Timber Dock Repairs. Specific items of work include, but are not limited to, demolition and disposal of existing marine treated timber piles; installation of 16-inch steel pipe piles through an existing timber deck; new pile connections to existing timber piles and new steel piles; repairs to existing timber pile caps, replacement and/or addition of new timber stringers and replacement of portions of the timber deck as noted and as required for the installation of the above work Bids due 01/25

Find complete details to this bid and more nationwide at envirobidnet.com FREE 30 DAY TRIAL click on link below

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
73 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19932

Posts: 28166

Administrators: JOHN: 7602, John: 6930

Skip to toolbar