Juneau: UAS AUKE BAY STATION, PHASE I - SITE AND BUIDLING DEMOLITION. Scope: The Work of Project is defined by the Contract Document Drawings and Specifications, is intended to prepare the site for the construction of a new building, and consists of the following: 1. Hazardous materials abatement of the existing 14,000 sf building formerly known as the NOAA Laboratory. The abatement work may occur prior to September 15, 2018.2. Salvage and turned over to the owner: The diesel generator, switch gear, load cell and fuel tank. Contractor shall transport these items to a location within 1 mine of the site. This work may occur prior to September 15, 2018.3. Demolition of the NOAA Laboratory structure and four smaller outbuildings as noted on the demolition plan. This work is to occur AFTER September 15, 2018.4. Clear and grub site in the indicated boundaries. Limited landscape plantings shall be salvaged by Owner prior to construction. Soil shall be salvaged and stockpiled for reuseas indicated. Trees and root structures shall be removed as indicated. This work is to occur AFTER September 15, 2018.5. Site shall be graded and prepared with base materials, silt containment, embankments and retaining structures as indicated. This work is to occur AFTER September 15, 2018.6. Water, sewer, power and communication lines and associated structures shall be installed as indicated. This work is to occur AFTER September 15, 2018.
Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
39 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950