Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
AK - Juneau: bridge demolition
November 10, 2013
5:36 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Juneau-Glacier Highway Brotherhood Bridge Replacement. Description: Replace Brotherhood Bridge (737). Reconstruct approach roadway as required to tie into new bridge alignment and lane configuration, including intersection improvements with Industrial Blvd. Construct new multi-use path along the north side of Glacier Highway/Egan Drive from Riverside Drive to the west side of the entrance to Engineers Cut-Off. Reconstruct existing equestrian path between Industrial Blvd. and Engineers Cut-Off. The section of separated, multi-use pathway between Engineers Cut-Off and UAS will be completed as part of Glacier Highway Brotherhood Bridge and Separated Multi-Use Path to UAS, Stage II. Engineer's Estimate Range: $20,000,000 to $30,000,000 Bids due 12/06

Find details to this bid and more you may be missing nationwide at envirobidnet.com (click below) try a FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
35 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar