AK DNR: CSP: North Fork Eagle River Earthquake Damage Repairs. Location: Eagle River, Alaska. Description: This solicitation includes work to remove existing steel bridge off the existing piling, remove and replace existing retaining walls, remove and replace steel piling, build up trail to the retaining walls, and reinstallation of the existing steel bridge. Engineer's Estimate Range: $100,001 - $200,000.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required
Most Users Ever Online: 429
Currently Online:
98 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950