Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
75th Ranger RIP/ROP Training Barracks Upgrade Project
March 2, 2009
6:18 AM
Avatar
Member
Forum Posts: 5298
Member Since:
August 29, 2005
sp_UserOfflineSmall Offline

NOTE: Any prospective Offeror interested in obtaining plans and specifications for this solicitation must register on our website at http://www.fedbizops.gov. Contractors can register to be put on a plan holders list that others can access through the FedBizOps site. No additional media (CD-ROM, floppy disks, faxes, etc.) will be provided. It is the Offerors responsibility to check the Internet address provided as necessary for any posted changes to this solicitation and all amendments. Technical inquires are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet...../index.cfm For additional information or assistance, please contact David White, Contract Specialist, at (912) 652-5705 or via email at [email]david.l.white@usace.army.mil[/email]. This project involves providing various repairs and renovations to Bldgs. 2832, 2833 and 2384, Fort Benning, GA including modernizing the exterior facade, replacing roofs with Standing Seam Metal Roof, replacing windows, upgrading all buildings to current AT/FP guidelines, reconfiguring the interior layout design to a 2 + 2 or open bay soldier layout plan, reconfiguration of Hammerhead areas to administrative, classroom, day room and storage space, correcting life-safety issues, demolition and replacement of all floors, ceilings and tile surfaces, demolition and reconstruction of all latrines and bathrooms, treatment and removal of all mold and mildew, replacement of all doors, locking systems and door hardware, removal of all asbestos and lead paint, upgrading the ventilation system, upgrading all fire alarms, installation of new fire sprinkler system, replacement of the entire electrical system including all wiring and panels, boxes, lighting, switches, receptacles and plates, replacement of all HVAC systems, replacement of all plumbing to correct flow problems, installation of a security and camera surveillance system, replacement of all building communication lines, reconfiguration and replacement of all stairwells, reconfiguration and/or add of storage space, addition of parking access with associate site-work including sidewalks and landscaping surrounding areas. The magnitude for this project is between $25,000,000 and $100,000,000. Options may be included in this contract. The Government anticipates Phase One documents to be issued on or about 19 Feb 2009. Up to five Offerors may be invited to participate in Phase Two. The following are the evaluation factors: Phase One FACTOR 1-1 Corporate Relevant Specialized Experience: FACTOR 1-2 Past Performance; FACTOR 1-3 Technical Approach Narrative. Phase Two FACTOR 2-1 Design Technical; FACTOR 2-2 Proposed Contract Duration and Summary Schedule; FACTOR 2-3 Small and Small Disadvantaged Business Utilization. This project will be solicited on an unrestricted basis pursuant to the Business Opportunity Development Reform Act of 1988 with a Hub-Zone evaluation preference utilizing a Two-Phase Design Build Request for Proposal in accordance with Federal Acquisition Regulation (FAR) Subpart 36.3. Proposals shall include sufficient detailed information to allow complete evaluation. The Government reserves the right to reject any and all offers. Offerors are reminded that while the Government may elect to consider data obtained from other sources, the burden of proof of acceptability rests with the Offeror.

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
112 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar