Proper way to shore up a wall.
December 26, 2007
1:56 PM
Avatar
Member
Forum Posts: 79
Member Since:
December 25, 2006
sp_UserOfflineSmall Offline

NYC, i am from rockland county. If you want, pm your contact info, and if i ever get some work out that way i could get it to you. Thats pushing my service area limit.

Demopro, I looked at it but did not bid. I am curious to see what your ball park number came in at. I thought to myself on paper around between 80-100k. Were you in the same area? Pm me your contact info as well!

December 26, 2007
6:20 AM
Avatar
demopro
Guest

nitrox .. i bid on that hotel job in stamford as well .. i didnt hear anythign back either but from what i see the job has started i could find the gc if your intersted

December 26, 2007
5:20 AM
Avatar
Member
Forum Posts: 105
Member Since:
April 24, 2007
sp_UserOfflineSmall Offline

The Job is in Augusta,Ga we had a problem arise the contractor who is going to be rebuilding is still in negotiations with some of the tenants who still have many months in their lease. So i'm not sure when this job is going to take place.

December 25, 2007
7:32 PM
Avatar
Member
Forum Posts: 57
Member Since:
February 3, 2007
sp_UserOfflineSmall Offline

Nitrox,
I never bid the CT work. I just suggested using minis. I am based in Staten Island but most of my work is in NYC. Where r u from?

December 24, 2007
9:21 AM
Avatar
Guest

this job wouldn't be in macon ga, would it? We lost a bid to tear down shopping center and leave part of it for a fresh market to build new.

December 23, 2007
2:56 AM
Avatar
Member
Forum Posts: 105
Member Since:
April 24, 2007
sp_UserOfflineSmall Offline

Yea we are tearing the stores down for the Fresh Market its expanding. There are 3 Walls to remain. We found a shoring contractor.

December 21, 2007
7:12 PM
Avatar
Member
Forum Posts: 79
Member Since:
December 25, 2006
sp_UserOfflineSmall Offline

NYC Demo, did you ever hear anything on the hotel job in CT? I put a bid in also and never heard back. Where are you from?

December 21, 2007
6:51 PM
Avatar
Member
Forum Posts: 57
Member Since:
February 3, 2007
sp_UserOfflineSmall Offline

Do yourself a favor and sub it out. You will be thankful later.

December 20, 2007
6:25 PM
Avatar
Member
Forum Posts: 74
Member Since:
September 18, 2005
sp_UserOfflineSmall Offline

What is going to happen to the wall that remains? Will it be rebuilt with masonry, EIFS, or will a new building be attached to it?
The last one we did, we stopped our demo one set of columns away from the point of the building that was remaining. We left that row of columns in place and cabled the columns for shearing. A new masonry wall was built to the underside of the existing columns. We then went in and removed that last part of the structure.We had to use some shoring in some areas where some beams were in place over windows.
Keep in mind that this was done with a demising/shoring plan.
If you already own the work, at least get an engineer to take a look.
Oh yeah, we also had to weld some reinforcing steel inside the building that was remaining.
The other thing that is a real big concern will be weather protection.

December 20, 2007
3:58 PM
Avatar
Member
Forum Posts: 105
Member Since:
April 24, 2007
sp_UserOfflineSmall Offline

Georgia.

December 20, 2007
2:13 PM
Avatar
Member
Forum Posts: 57
Member Since:
February 3, 2007
sp_UserOfflineSmall Offline

That is exactly why you should sub it out. God forbid you have a problem, your GL carrier will drop you for working out of your category. I am surprised a shoring contractor won't take it. That is what they are insured to do. I exclude shoring all the time. What state are you located in?

December 19, 2007
8:42 AM
Avatar
Member
Forum Posts: 105
Member Since:
April 24, 2007
sp_UserOfflineSmall Offline

They are solid poured with concrete sitting on a 6" slab on top of 6" crush and run. I've talked to a few contractors about doing the shoring, but they aren't to thrilled about excepting the liability if the wall collapsing, not only that, but the stores that aren't being torn down are going to be open for business while we tear the 80% of the shopping center down.

December 19, 2007
8:10 AM
Avatar
Member
Forum Posts: 57
Member Since:
February 3, 2007
sp_UserOfflineSmall Offline

Call a structural engineer or sub it out to a shoring contractor. Avoid the headaches and responsibilities of doing it yourself.

December 19, 2007
4:11 AM
Avatar
Member
Forum Posts: 105
Member Since:
April 24, 2007
sp_UserOfflineSmall Offline

I have a shopping center I am getting ready to tear down, but two stores are to remain. I have to shore up one side. What is the best way to do that? The wall is about 70 feet in length and is about 20 feet high and the wall is made of concrete block. Steel truces connect the stores.

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
106 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar